This is a continuation of the previous DBR photo gallery. This facility amplified the signal and regulated the gain of the auxillary repeaters along the line. Repeater spacing 50 miles. Shown is the O Carrier terminal facility equipment from inside the building shown.
Recent Posts
- 2023 ESTC Eric Dollard, Adrian Marsh PhD, Aaron Murakami Ultra Low Frequency Amplifier-Modulator
- 2023 ESTC ERIC DOLLARD – FOUR PHASE ANALYSIS OF BWV 536, J.S. BACH
- 2023 ESTC ERIC DOLLARD – HISTORY, THEORY & PRACTICE OF THE FOUR PHASE SYSTEM
- 2023 06 03 ERIC DOLLARD LIVE CALL
- 2023 05 06 Eric Dollard Live Video Call
Meet Eric Dollard Live!
Come see Eric Dollard present at the Energy Science & Technology Conference