Posted on Leave a comment

Cosmic Induction Generator Update Jan-Feb 2021

Cosmic Induction Generator Update

This is an update from January here at the shop in Spokane with Eric Dollard. We’re working non-stop on this project with the hopes of being able to demonstrate this at the 2021 ESTC – seating is limited, get your tickets here: https://energyscienceconference.com

At this point now, we’re actually 99% done with the audio rack and are making rapid progress on the RF rack, which we will show you very soon. Below are THREE videos that I had time to edit and make avail – there are quite a few pictures and videos that I’ll post in the near future showing more of the progress that we’ve made.

Please donate to EPD Laboratories, Inc. – donate info is in the right column.

Video #1 below is from January 21, 2021 and is a general update video:

Video #2 below is from January 30, 2021 and is a short video of the old HP Scope that Eric rejuvenated back to life.

Video #3 below is from January 31 and February 2, 2021 and shows the 1940s Collins Transmitter, which sat out in the Arizona desert getting rained on, etc. and it is now in working condition. There are some general updates in addition to some details on the Tesla Coils that the tuning unit will be feeding. Most of the coil project is already built and we’ll show pics/vids of that later.