Posted on Leave a comment

Transmission System Structure A52-E – Beginning of the Project

Broken poles and dangling wires, missing guy wires, etc. being cleaned up and preparations made for installing the new open wire facilities for the Alexanderson-Beverage Earth Signal Receiving Antenna. (ASW – Advanced Seismic Warning System). The repairs were done by myself (Eric Dollard) and Justin Miller (member of EPD Labs).

Part of this project consists of removing two miles of no longer used well pump control lines of open wire construction. Wire is 8 awg open wire subscriber telephone line. This wire will be used later as well as the cross arms on the overall Long Line Project.

Leave a Reply