Posted on Leave a comment

DBR Line Main Repeater Office

This is a continuation of the previous DBR photo gallery. This facility amplified the signal and regulated the gain of the auxillary repeaters along the line. Repeater spacing 50 miles. Shown is the O Carrier terminal facility equipment from inside the building shown.

Leave a Reply